Sign In | Join Free | My frbiz.com |
|
Quality Management
Shinelink Technology Ltd has developed a series of management procedures and approaches to assure the product delivery meets the customers’ requirements through the whole product realization from the selection of the suppliers, WIP inspection, and outgoing inspection to the customer service. Here are some of the examples:
Evaluation And Audit Of our Suppliers
Suppliers must be evaluated before approval by Shinelink’s supplier evaluation team. In addition, Shinelink will appraise and rank every supplier once a year to guarantee the suppliers provide the quality materials meeting Shinelink’s requirements. Furthermore, Shinelink continuously develops suppliers and promotes them to improve their quality and environment management basing on the systems of ISO9001.
Contract Review
Before accepting an order, Shinelink shall review and verify customer’s requirements to make sure that Shinelink has the capability to satisfy customers’ requirements including specification, delivery and other demands.
Preparation, Review And Control Of Manufacturing Instruction
Shinelink will evaluate all the requirements after receiving the customers’ design data and related document. Then, transfer the design datum into manufacturing datum by CAM. Finally, a MI which incorporates the manufacturing datum will be formulated according to Shinelink’s real manufacturing process and technologies. MI must be reviewed after preparation by independent engineers. Before the MI is issued, it must be reviewed by QA engineers and get approved. Drilling and routing datum must be confirmed by first article inspection before issued. In a word, Shinelink makes ways to guarantee that the manufacturing documentation is right and valid.
Process Controls Of Fabrication
Right manufacturing instruction (MI), total equipment management and maintenance, strict WIP inspection and monitoring as well as working instructions, all these make the whole production process totally controlled. Various precise inspection equipments including the AOI inspection system as well as perfect WIP inspection instructions and control plan, all these guarantee that semi-products and final products, all reach the requirements of customers’ spec.
Incoming Control IQC
In Shinelink, all materials must be verified and approved before going to the warehouse. Shinelink establishes strict verifying procedures and working instructions to control the incoming. Furthermore, Shinelink owns various precise inspection instruments and equipment to guarantee the capability to rightly judge whether the verified material is good or not. Shinelink applies a computer system to manage materials, which guarantees that materials are used by first-in-first-out. When one material gets close to expiry date, the system will issue a warning, which ensures that materials are used up before expiry or verified before use.
Final Control And Inspection
In Shinelink, all PCBA must go through the open and short test as well as visual inspection after passed the relative physical tests. Shinelink owns various advanced test equipments including AOI Testing, and In-Circuit Testing for finished PCB assembly
|
|
|
Contact Person: MsSandy